ECONOMICS / COST MODEL
What a GPU-hour
in orbit costs.
Year by year to 2045, against the same GPUs in a US data centre. Launch prices follow the experience curve of space launch, measured over more than 4,400 launches; the node's mass comes from our sizing model and every cost from our cost model. The simulator opens on our case; its scenarios show what happens if launch stops getting cheaper, satellites stay costly or launch grows faster or slower, and every assumption stays open for engineers.
03 / NODE SIZE
How big should a node be?
Every node carries mass that does not shrink with its power: avionics, attitude control, propulsion and radios. A cluster also needs a spare node, so that losing one does not lose capacity. Small nodes repeat the fixed mass; large nodes need a large spare. Turyshev (JPL, 2026) writes this trade as an objective whose best node size grows with the square root of the cluster's size.
SMALL NODESFixed mass, repeated.
At 300 kg per node, a 10 kW node carries 30 kg of it per kilowatt and a 100 kW node 3 kg. Below 10 kW the fixed mass outweighs the arrays, radiators and compute.
LARGE NODESA spare as big as a node.
A 1 MW cluster built from 500 kW nodes needs a 500 kW spare: half its mass again. Large nodes also outgrow launchers: one Starship V3 can carry a node of about 2.7 MW with our 2030 design.
THE BALANCEAbout 100 kW for the first megawatt.
With our 2030 design, the lightest node for a 1 MW cluster is about 107 kW, at 31.9 kg per kilowatt; 20 kW nodes are 31% heavier. For 100 MW it is about 1.1 MW. Node-1 is planned at 10–20 kW because it flies alone, on a purchased bus, within rideshare and medium-lift capacity.
04 / METHOD AND LIMITS
Published curves, our model, stated assumptions.
The cost of a GPU-hour follows our cost model v3.1. Launch and satellite costs are annualised at 10% over five years, with 5% a year added for operations, ground stations and insurance, and divided by 96% availability, the share of the year the node computes. GPUs cost $30,000 per kW in both places, with 15% spares in orbit; each GPU draws 1.2 kW and works 70% of the time. The ground pays $12 per watt for its building over 15 years, 9.0 cents per kWh (US EIA, industrial, 2026) at a PUE of 1.25, and $250 per kW-year of upkeep. Launch to the 650 km dawn–dusk orbit costs 1.45 times the low-orbit price per kilogram. The model reproduces the cost model's published cases, $29.64 per GPU-hour with 2026's best launch and satellites, $7.46 around 2030 and $3.14 at $200 per kilogram against $2.04 on the ground; automated tests check this on every build.
The launch paths reproduce Terzi and Nicoli's projections from their published data to within $2 per kilogram: $1,568 in 2030 and $272 in 2040, with 9,148 t launched in 2030 and 31,889 t in 2040. Their prices are 2024 dollars per kilogram of low-orbit capacity. The satellite cost paths, from $200 to $10 per watt in the mass-production case, and the target of 100 kW of compute per tonne are scenarios, not forecasts. Mass per kilowatt comes from our sizing model on the power-and-heat page: 41, 26 and 17 kg per kW for 2026, 2030 and 2035 designs. Node size follows Turyshev's objective with one spare node per cluster; the fixed mass per node is the main uncertainty, and the scenarios span its published range.
Not modelled: taxes and subsidies, insurance pricing, launch failures, debris and end-of-life disposal, the price customers pay for inference, demand, and the value of speed or sovereignty.
Sources: Terzi and Nicoli, From Sputnik to Starship, PNAS Nexus 5(7), 2026, with its Data S3; Google, Towards a future space-based, highly scalable AI infrastructure system design, 2025; Turyshev, Orbital data centers: spacecraft constraints and economic viability, 2026 and Operations, maintenance and industrial scaling of MW-class orbital data centers, 2026; SpaceX, Form S-1 (June 2026) and rideshare price list (October 2026); US EIA Short-Term Energy Outlook, September 2026; GPU rack prices from DatacenterDynamics (2024) and Wing VC (2026). No launch provider or chip maker is represented as a partner.