WORKLOAD EXPLORER

How much data
would you need to send?

The tabs describe three ground benchmark workloads, led by SAR maritime. One shared, illustrative calculator shows data-volume arithmetic only; it does not measure or predict hardware performance.

SAR FIRSTprimary candidate
FIREsecondary candidate
OPTICALcontrol benchmark

ILLUSTRATIVE CALCULATOR

01 / SAR-FIRST WORKLOAD SCREEN

Explore the data-volume tradeoff.

The tabs change only the workload description. They share one illustrative data-volume calculator; it does not compare workloads or predict hardware throughput, runtime, energy, model accuracy, contact access, or customer value.

This calculator is illustrative. Read our separately measured research results.

WORKLOAD DESCRIPTIONS / SAR FIRST

PRIMARY BENCHMARK CANDIDATE / NOT MEASURED YET

SAR maritime vessel detection and scene prioritization

Find vessels in radar imagery and return compact detections plus selected image chips for review.

INPUT DATA
Synthetic-aperture radar imagery
OPERATIONAL OUTPUT
Return georeferenced vessel detections and priority image chips before full-scene delivery
POTENTIAL BUYER QUESTION
Which vessels or maritime scenes need immediate review?

Program priority. One image does not establish identity, intent, or illegal activity; activity cues require temporal, AIS, RF, or other corroborating context.

SHARED ILLUSTRATION / LOCAL

Data-volume calculator

Raw collection38.40 GB
Priority result86.4 MB
Scenario ratio444.4x

PENDING_MEASUREMENT / DETERMINISTIC SCENARIO

GROUND BENCHMARK / ThroughputNot measured yetscene/s / HARDWARE TEST REQUIRED
GROUND BENCHMARK / End-to-end latencyNot measured yets/scene / HARDWARE TEST REQUIRED
GROUND BENCHMARK / Task-quality metricNot measured yetworkload-defined / HARDWARE TEST REQUIRED
GROUND BENCHMARK / Compute energyNot measured yetWh/scene / HARDWARE TEST REQUIRED

Changing workload tabs changes only the description; all three share these illustrative inputs and arithmetic. The displayed ratio is not a workload comparison, measured downlink reduction, operational promise, link budget, or measure of hardware or model performance.

02 / MEASUREMENT RULE

A number becomes evidence only when its source is traceable.

INPUTDataset + license

Exact files, rights, split, preparation steps, and file fingerprints.

MODELArtifact + version

Weights, runtime, precision, parameters, and task metric.

RUNHardware + telemetry

Configuration, elapsed time, energy when measured, temperatures, and errors.

RESULTReviewable record

Machine-readable output that is withheld when its source record is incomplete.

Have a live mission data path or a workload that belongs in the ground screen?

Contact the team